Executive design and on-site engineering adaptation of the turbine building of the Caorso nuclear power plant

Field: Decommissioning

Customer
F.lli Omini S.p.A.
Brief description of the order
The purpose of the intervention of this executive design is to adapt the Turbine Building to the new intended use. In particular, the following interventions were developed: demolition of reinforced concrete structures, dismantling of metal structures, construction of new structures in metal carpentry and mixed works in reinforced concrete, reconstruction of the flooring screed, and drainage collection system. The presence of on-site technical staff was guaranteed for the entire duration of the works in order to support the R.T.I. relating to the implementation of the executive project, management of changes in progress and in as-built, safety (POS drafting and its additions), management of the order quality control plan.