Field: Environmental
Executive design of supernatant recovery systems in the Priolo Gargallo groundwater
Customer
Arcadis Italia
Brief description of the order
The design was carried out for the optimization and hydraulic containment methods of the north bank of the Vallone della Neve. The intervention involved the construction of n. 8 extraction wells and related service infrastructures located at the multi-company site in Priolo Gargallo (SR), replacing the containment system consisting of a draining trench and 194 well points.