Improvements design to the Gela waste-to-fuel pilot plant

Customer
Eni Rewind S.p.a.
Brief description of the order
The project involved several multidisciplinary interventions carried out over three years with the aim of making changes to the Gela Waste-to-Fuel Plant, including the engineering of the recommendations that emerged from the operability analysis (HazOp); The design involved the engineering of the improvements proposed by Eni Progetti in September 2019, the management of the rainwater of the plant, the management of the authorization process with INAIL for the commissioning of the pressure equipment (Pipes and containers), the engineering of the installation of the new S-01 tank and finally the assistance in the field for the realization of the latest improvements proposed by Eni Progetti in 2020.